Simulation software for harvest planning
Harvest Scheduler
is a system for simulating forest harvesting. It predicts the production of volume by log type of each harvesting crew, and the net stocked area reduction of the harvest unit in which each crew is working.
Predictions are made on a daily basis based on crew production rates and availability. Reports are generated at different time-scales from daily through to annual. Key reports show production through time by forest, crew and log type.
Benefit

Harvesting Crews
A crew has a unique name and may represent an actual harvesting crew, or a token crew to trial a required increase in capacity. Each crew has a move-and-set-up time, a specified number of days worked, a harvest list, and a production rate (crew and / or harvest unit specific). The harvest list is a sequenced list of harvest units that the crew will harvest in the specified order.
Each harvest unit refers to a cutting pattern selected from the harvest unit’s assigned yield cube and has an option to specify a finish date (or harvesting will continue until completion of the area).
Harvest Units
A harvest unit is any area of forest which will produce log volume and grade more-or-less uniformly across its extent. Hence one yield cube is sufficient to predict the yield. A harvest unit could be a setting (the ATLAS Harvest Manager system recognises a hierarchy of Forest, Block, Harvest Area, Setting), or a stand (ATLAS GeoMaster uses Forest, Compartment, Stand).
A harvest unit must have a plant date so that yields can be indexed by age. Yield cubes are selected and referenced from ATLAS Yield Table Manager. The net stocked area at the start of the simulation must also be known.

Scenarios
A scenario is a self-contained set of planning data from which a simulation can be run to produce all the standard reports. Scenarios are used to try variants of the inputs (crews, production rates, harvest list etc.), and to update the starting point for a simulation.
Reporting
All reports can be generated at different time scales: daily, weekly, monthly, quarterly, and annually. Production charts and reports show the log production by grade through time. Area charts and reports show the depletion of net stocked area from harvesting. Gantt charts show the sequence of harvest units the crews work through by time. Production and area report data can be exported to Excel.
Harvest Scheduler uses Yield Table Manager to provide yield information. Harvest units can be sourced from GeoMaster stands or from Harvest Manager settings / harvest areas or manually entered.
Reports can be exported to Excel for more detailed analysis.